1.2 km
From the iPhone plant
Tata Electronics is 1.2 km away, and Exedy and Bando are 600 m down Narasapura Industrial Road. Staff can reach work in minutes.
The Ridge by Navilu · Narasapura, Kolar
A once-in-a-decade opportunity. A land investment with high capital appreciation and rental income potential, in a gated 20-acre layout inside the Narasapura industrial belt.
Why The Ridge
1.2 km
Tata Electronics is 1.2 km away, and Exedy and Bando are 600 m down Narasapura Industrial Road. Staff can reach work in minutes.
₹1.12 L
An illustrative 30 × 40 plot with 16 workforce rooms at ₹7,000 a room, in a belt where factory staff need housing close to work.
Day 1
DTCP layout approval, RERA registration, and the sale deed registered in your name as soon as RERA comes through.
The master plan
Two clusters of plots joined by a central road, with tree-lined parks, play areas, footpaths and an entrance on the east side.
Disclaimer. This is a concept layout. All specifics of the plan, including plot numbers, sizes, dimensions, roads, parks, amenities and the entrance, are subject to change in the final approval by the authorities. The approved plan will prevail.
Inside the gate
An entrance arch, a security cabin and a cobblestone forecourt on the east side.
Round-the-clock watch over the layout.
Tree-lined parks with children's play areas run through the layout.
With footpaths on both sides.
No overhead cables across your plot.
Storm and sewer lines below the roads.
A water connection to every plot.
Purified drinking water from a common RO plant inside the layout.
Lit roads across the whole layout.
The neighbourhood
36 manufacturers, logistics firms and institutions in and around the Narasapura industrial area.
Logos are trademarks of their owners, shown to indicate companies in the area. No affiliation is implied.
Location and connectivity
The site sits just west of Narasapura Industrial Road, the spine of the KIADB estate, with the factories on one side and the highway to the north.
Straight-line distances measured from the site pin. Road distances are longer.
NHAI plans a 10-lane corridor from Hoskote towards the Andhra border, easing truck and commuter access to Narasapura.
The Karnataka section opened in December 2024. The full corridor to Chennai is due by 2027.
Meets NH-75 and the expressway, tying the whole industrial belt into one network.
Straight-line distances from the site pin, rounded. Road distances and travel times are longer.
Pre-launch investment opportunity
Twenty-five investors can secure a 1,200 sq ft plot now, ahead of the planned ₹4,500 RERA launch price.
14 of 25 slots are taken. 11 remain.
Your ₹35.99 L comes back if RERA registration is not obtained within 6 months, plus a 3-month buffer.
The sale deed for your plot is registered in your name when RERA comes through.
₹2,999 per sq ft against a planned RERA launch price of ₹4,500.
Illustrative scenarios, not promised returns. Assumes ₹35.99 L invested in mid-October 2026 and one sale at the price shown. Before stamp duty, registration and taxes.
Oct 2026
Invest and receive your entitlement letter
Q4 2026 – Q1 2027
Land conversion and DTCP approval
End of Q1 2027
RERA, your sale deed, launch at ₹4,500
End of Q1 2028
Layout complete, plot handover
The developer
A Bengaluru developer with plotted, villa and high-rise projects across the city's growth corridors.
Questions
DTCP layout approval and RERA registration are in process. Plots are offered for sale only after RERA registration, and the RERA number will be shown on this page.
Most plots are 30 × 40 (1,200 sq ft): 242 of the 300. Another 35 are deeper plots along the edges, and a few are odd-size. Almost all face east or west.
On RERA registration. The plot is handed over when the layout is complete, planned for the end of Q1 2028.
Yes, within the DTCP building rules for the layout. Many owners near industrial areas build several floors of single rooms for staff and contractors.
Twenty-five investors can invest ₹35.99 L now for a 1,200 sq ft plot, at ₹2,999 per sq ft. The amount is refunded in full if RERA registration is not obtained within 6 months plus a 3-month buffer.
Enquire
Send your details and our team will call you back with availability and the next steps. Your enquiry reaches us on WhatsApp.